subject
Engineering, 25.10.2019 22:43 leah7378

Discussion: minimizing recovery time strategies

learning objectives and outcomes

engage in a discussion on strategies to minimize recovery time in a windows environment.

assignment requirements

ken 7 windows limited has added several new servers and workstations to the ken 7 domain to support the new enterprise resource planning (erp) software. while losing a workstation to a disastrous event would be uncomfortable, losing a server would have a far greater impact to ken 7 windows. therefore, it’s important that plans are in place to recover from any unexpected situation in as short a time as possible.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 19:10
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
question
Engineering, 05.07.2019 10:10
What is the correct way to measure the overall length of a boat? measure from the tip of the bow to the highest point on the gunwale. measure from the tip of the bow in a straight line to the stern of the boat. measure from the tip of the bow in a straight line to the back seat. measure from port to starboard at the boat's widest point.
Answers: 1
You know the right answer?
Discussion: minimizing recovery time strategies

learning objectives and outcomes
<...
Questions
question
English, 15.12.2020 23:10
question
Mathematics, 15.12.2020 23:10
Questions on the website: 13722360