subject
Engineering, 24.10.2019 17:43 dnjames01

Acentral power plant, whether the energy source is nuclear or fossil fuel, is a heat engine operating between the temperatures of the reactor or furnace and the surroundings, usually represented by a river or other body of water. consider a modern nuclear power plant generating 750,000 kw with reactor temperature 600 f (1059.67 r) next to a river at temperature 70°f (529.67°r). a. what is the maximum possible thermal efficiency of the plant and what is the minimum amount of heat (btu/s) that must be discarded to the river? actua b. if the actual thermal efficiency, atn, of the plant is 60% of the maximum, 1 actual how much heat (btu/s) must be discarded into the river and what will the temperature rise of the river be if the river flows at a rate of 5800 ft/s? useful data: c h20 1 btu/ibm f and ph20 62.4 lbm/ft comments: your answer to part (b) is the temperature rise of an entire river of moderate size and is the most commonly mentioned form of thermal pollution. one useful conversion is 1kw 0.948 btu/s.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Acentral power plant, whether the energy source is nuclear or fossil fuel, is a heat engine operatin...
Questions
question
Physics, 19.05.2021 19:20
question
English, 19.05.2021 19:20
Questions on the website: 13722359