Engineering, 15.10.2019 21:00 lllamasarebae3061
The prince company, inc has 100 employees. in 2009, the employees worked a total of 350,000 hours annual and reported 145 injuries/illnesses. what is the incident rate for 2009? from the problem above if only 79 injuries/illnesses resulted in lost workdays or restricted work activity, what will the lost workday incident rate be for 2009?
for the problems, if needed, the values of 910,000 for death, 27,000 for loss work day incidents, and 7,000 for no lost work day.
Answers: 2
Engineering, 03.07.2019 14:10
Amass of m 1.5 kg of steam is contained in a closed rigid container. initially the pressure and temperature of the steam are: p 1.5 mpa and t 240°c (superheated state), respectively. then the temperature drops to t2= 100°c as the result of heat transfer to the surroundings. determine: a) quality of the steam at the end of the process, b) heat transfer with the surroundings. for: p1.5 mpa and t 240°c: enthalpy of superheated vapour is 2900 kj/kg, specific volume of superheated vapour is 0. 1483 m/kg, while for t 100°c: enthalpy of saturated liquid water is 419kj/kg, specific volume of saturated liquid water is 0.001043m/kg, enthalpy of saturated vapour is 2676 kj/kg, specific volume of saturated vapour is 1.672 m/kg and pressure is 0.1 mpa.
Answers: 3
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
The prince company, inc has 100 employees. in 2009, the employees worked a total of 350,000 hours an...
Mathematics, 18.10.2019 13:30
Biology, 18.10.2019 13:30
Mathematics, 18.10.2019 13:30
Health, 18.10.2019 13:30
Chemistry, 18.10.2019 13:30
English, 18.10.2019 13:30
Spanish, 18.10.2019 13:30
English, 18.10.2019 13:30
Mathematics, 18.10.2019 13:30
Physics, 18.10.2019 13:30
Mathematics, 18.10.2019 13:30
English, 18.10.2019 13:30
Mathematics, 18.10.2019 13:30