There are 20 automatic turning machines in the lathe department. batches of parts are machined in the department, each batch consists of setup and run times. batch size = 100 parts. the standard time to set up a machine for each batch is 5.0 hours. four setup workers perform the setups. they each work 40 hours per week. once a machine is set up, it runs automatically, with no worker attention until the batch is completed. cycle time to machine each part = 9.00 min; thus, it takes 15 hours of run time to produce a batch. assume all machines are perfectly reliable. what is the production output of the lathe department in 40 hours of operation per week?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
You know the right answer?
There are 20 automatic turning machines in the lathe department. batches of parts are machined in th...
Questions
question
History, 17.12.2020 23:10
Questions on the website: 13722363