Engineering, 06.10.2019 18:00 aronrobinson4

Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at minimum cost. solve using graphical method. a construction site has machines that simultaneously excavate and grade
machine a grades:
ga = 18.9 unit h-1
and excavates:
ea = 17.4 unit h-1
the cost to operate machine a is:
ca = 109 $ h-1
machine b grades:
gb = 8.41 unit h-1
and excavates:
eb = 23.9 unit h-1
the cost to operate machine b is:
cb = 109 $ h-1
each machine can be assigned to the cul-de-sac for no more than 10 hours.
amount of grading:
g = 100 unit
amount of excavating:
e = 150 unit
"units" here are a measure of volume.
what are the optimal number of hours to operate machine a? what are the optimal number of hours to operate machine b? what is the minimum cost to complete the excavation and grading?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at...
Questions
question
Mathematics, 25.09.2019 02:00
question
Mathematics, 25.09.2019 02:00
question
Advanced Placement (AP), 25.09.2019 02:00
question
Social Studies, 25.09.2019 02:00
question
Biology, 25.09.2019 02:00
question
Computers and Technology, 25.09.2019 02:00
Questions on the website: 13722366