subject
Engineering, 06.10.2019 06:00 JAlvelo

Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at minimum cost. solve using graphical method. given a construction site has machines that simultaneously excavate and grade machine a grades: ga = 18.9 unit h-1 and excavates: ea = 15.5 unit h-1 the cost to operate machine a is: ca = 101 $ h-1 machine b grades: gb = 10.2 unit h-1 and excavates: eb = 23.2 unit h-1 the cost to operate machine b is: cb = 1.10e2 $ h-1 each machine can be assigned to the cul-de-sac for no more than 10 hours. amount of grading: g = 100 unit amount of excavating: e = 150 unit "units" here are a measure of volume

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
You know the right answer?
Determine the optimal number of hours to use machines a and b to excavate and grade a cul-de-sac at...
Questions
question
Health, 24.02.2021 03:40
Questions on the website: 13722367