subject
Engineering, 02.10.2019 01:10 shinekamui

28-7 a long segment of suburban freeway is to be designed on level terrain. the level segment, however, is followed by a 4.5% grade, 2.0 miles in length. if the ddhv is 2,500 veh/h with 15% trucks (standard mix), how many lanes will be needed on the (a) upgrade, (b) downgrade, (c) level terrain segment to provide for level of service c? lane widths and lateral clearances may be assumed to be 12 ft and 6 ft, respectively. ramp density is expected to be 1.0 ramps/mi. the phf is 0.92. good weather, no incidents, no work zones, and regular users of the facility may be assumed.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
You know the right answer?
28-7 a long segment of suburban freeway is to be designed on level terrain. the level segment, howev...
Questions
question
Mathematics, 20.01.2020 04:31
question
Spanish, 20.01.2020 04:31
question
History, 20.01.2020 04:31
Questions on the website: 13722363