subject
Engineering, 20.09.2019 00:30 ella3714

Idont undertand this coding problem (java):
enter item name that blackbeard needs? sea biscuit
what is the price of one sea biscuit? 1.12
enter quantity of sea biscuits: 3
blackbeard's money calculating program
by: your name here
3 sea biscuits: $3.36
tax (8.25%) 0.28
total due: 3.64
how much did blackbeard pay? 5.00
change due to blackbeard: 1.26
dollars: 1
quarters: 1
dimes: 1
nickels: 1
pennies: 1


Idont undertand this coding problem (java): enter item name that blackbeard needs? sea

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
You know the right answer?
Idont undertand this coding problem (java):
enter item name that blackbeard needs? sea biscui...
Questions
question
English, 19.09.2021 16:30
question
Chemistry, 19.09.2021 16:30
Questions on the website: 13722367