subject
Engineering, 14.09.2019 00:30 cxttiemsp021

The venturi is being used as a suction device to introduce petrol into an air stream, as in a carburettor in a car engine. using continuity and bernoulli’s equation. the diameter of the air duct at the throat of the venturi is 15 mm, expanding to 30 mm at the exit into the atmosphere. the suction pipe exits to the air flow 150mm above the surface of the liquid reservoir. the liquid fuel and air have densities of 800kg/m3 and1.2kg/m3 .assume the air to be an ideal fluid. state and justify any other assumptions made. 1)- draw venturi meter, showing the inlet and outlet of the fluid. 2)- estimate the volume flow rate q of air required before liquid is sucked into the airstream. 3)- list systematically the hydrostatic pressure laws.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 04.07.2019 19:10
The sum of the normal stresses does not change as the stress state rotates through an angle. a)-trune b)- false
Answers: 2
You know the right answer?
The venturi is being used as a suction device to introduce petrol into an air stream, as in a carbur...
Questions
question
Business, 03.11.2019 08:31
question
Biology, 03.11.2019 08:31
Questions on the website: 13722363