subject
Engineering, 13.09.2019 22:30 NidaFurqan

Aproduct whose annual demand=80,000 units is produced on a manual assembly line. the line operates 50 wks/year, 5 shifts/wk, and 7.5 hr/shift. work content time 48.0 min. line efficiency = 0.97, balancing efficiency = 0.93, and repositioning time - 8 sec. determine (a) hourly production rate, (b) number of workers, and (c) number of workstations if the manning level is 1.4.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
You know the right answer?
Aproduct whose annual demand=80,000 units is produced on a manual assembly line. the line operates 5...
Questions
question
Mathematics, 10.02.2021 22:00
question
Mathematics, 10.02.2021 22:00
question
Mathematics, 10.02.2021 22:00
question
Mathematics, 10.02.2021 22:00
question
Mathematics, 10.02.2021 22:00
question
Mathematics, 10.02.2021 22:00
Questions on the website: 13722367