A7-station transfer line has been observed over a 40-hour period. the process times at each station are as follows: station 1, 0.80 min; station 2, 1.10 min; station 3, 1.15 min; station 4, 0.95 min; station 5, 1.06 min; station 6, 0.92 min; and station 7, 0.80 min. the transfer time between stations = 6 sec. the number of downtime occurrences = 110, and hours of downtime = 14.5 hours. a proposal has been submitted to locate a storage buffer (capacity = 20) between stations 4 and 5 to improve line efficiency. using the upper-bound approach, compute the line efficiency and production rate of the new buffer installed transfer line.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
You know the right answer?
A7-station transfer line has been observed over a 40-hour period. the process times at each station...
Questions
question
Chemistry, 22.04.2020 11:17
question
Mathematics, 22.04.2020 11:18
question
Mathematics, 22.04.2020 11:19
question
History, 22.04.2020 11:22
question
Mathematics, 22.04.2020 11:23
Questions on the website: 13722367