subject
Engineering, 21.08.2019 05:30 toniawu18

Acooling tower for an engineering process takes in air at 20 °c dry bulb with a relative humidity of 70% and discharges air at 29 °c dry bulb with a relative humidity of 95%. the air flow is recorded to be 400 m per hour at the inlet point. what is the quantity of heat energy being produced by the process and how much will it cost in top-up water alone, for an 8 hour shift, if the top-up water costs €0.20/litre. you may assume the air and humidity values are consistent during the complete 8hr shift.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 18:10
The drive force for diffusion is 7 fick's first law can be used to solve the non-steady state diffusion. a)-true b)-false
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
You know the right answer?
Acooling tower for an engineering process takes in air at 20 °c dry bulb with a relative humidity of...
Questions
question
History, 27.05.2020 07:59
question
Mathematics, 27.05.2020 07:59
question
Mathematics, 27.05.2020 07:59
question
Physics, 27.05.2020 07:59
Questions on the website: 13722363