Engineering, 18.07.2019 23:30 carlosthenoob03

The results of cost estimating can be used to serve all of the following objectives, except a)- benchmarking of a firm's productivity improvements b)- evaluating the optimal capital required to make improvements to products (product design) c)- cost estimating doesn't really make sense to engineers. it is the responsibility of accountants. d)- setting selling prices in evaluating engineering contract projects e. none of the above

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
The results of cost estimating can be used to serve all of the following objectives, except a)- benc...
Questions
question
Geography, 03.12.2019 03:31
question
Mathematics, 03.12.2019 03:31
Questions on the website: 13722363