Engineering, 11.07.2019 01:10 Ryan02717

Ariver flowing steadily at a rate of 175 m^3/s is considered for hydroelectric power generation. it is determined that a dam can be built to collect water and release it from an elevation difference of 80 m to generate power. determine how much power can be generated from this river water after the dam is filled. take the density of water to be 1000 kg/m^3

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
Asolid cylinder is concentric with a straight pipe. the cylinder is 0.5 m long and has an outside diameter of 8 cm. the pipe has an inside diameter of 8.5 cm. the annulus between the cylinder ad the pipe contains stationary oil. the oil has a specific gravity of 0.92 and a kinematic viscosity of 5.57 x 10-4 m2/s. most nearly, what is the force needed to move the cylinder along the pipe at a constant velocity of 1 m/s?
Answers: 3
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
You know the right answer?
Ariver flowing steadily at a rate of 175 m^3/s is considered for hydroelectric power generation. it...