subject
Engineering, 10.07.2019 03:10 heavendl13

Which of the following actions by the team or their leadership can result in reduced team performance?
select one:
a. the team leader promotes an intrinsically interesting or challenging project.
b. the team leader rewards a team member with a clock for his or her hours of overtime spent in the service of a team’s project.
c. the team shares, and mutually sets, their own performance goals.
d. team leaders increase team size so that more employees get an opportunity to contribute to the project.
question 17
not yet answered
points out of 2.00
not flaggedflag question
question text
the positive illusion bias refers to:
select one:
a. people who believe themselves to be superior and more talented than others on their team.
b. people who work harder for the team hoping to improve the overall team’s reputation within the larger organizational context.
c. managers who convey a positive attitude in order to positively influence their team’s group mood.
d. a team member who has positive news to share about the group’s task in hopes that it will spur morale and increase productivity.
question 18
not yet answered
points out of 2.00
not flaggedflag question
question text
the positive illusion bias, or unwarranted beliefs in one’s own superiority, can wreak havoc in teams. why?
select one:
a. individuals believe their contributions will not be sufficient to justify their efforts.
b. individuals with this bias are interested in vastly different team goals than that of their other teammates.
c. individuals who see themselves as above average are likely to engage in social loafing because they have a false sense of the value of their contributions.
d. individuals with this bias always have a high sense of the protestant work ethic.
question 19
not yet answered
points out of 2.00
not flaggedflag question
question text
which of the following performance criteria are used to evaluate the success of a team?
select one:
a. productivity
b. financial profit
c. diversity
d. rewards
question 20
not yet answered
points out of 2.00
not flaggedflag question
question text
the team performance equation attempts to predict the actual productivity of a team. it states that the ap (actual productivity) of a team equals:
select one:
a. the potential productivity of a team, plus team synergies, minus team threats.
b. the potential productivity of a team, plus team culture, minus free-riding.
c. the potential productivity of a team, plus task design, plus team culture.
d. cohesion, plus learning, plus integration.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
You know the right answer?
Which of the following actions by the team or their leadership can result in reduced team performanc...
Questions
question
History, 20.04.2020 22:23
Questions on the website: 13722367