Which statement is true with regard to project scheduling? A.
Scheduling in plan-based processes does not change with the progress of the project.
B.
Plan-based processes use an iterative approach for scheduling each phase of the project.
C.
Scheduling in an agile process involves planning the short-term phases of a project.
D.
Agile processes require less detail than plan-based processes do in an initial project schedule.

ansver
Answers: 3

Another question on Computers and Technology

question
Computers and Technology, 22.06.2019 16:30
Technician a says that a dry sump system uses no oil storage sump under the engine. technician b says that a wet sump system uses no oil storage sump under the engine. who is correct?
Answers: 3
question
Computers and Technology, 23.06.2019 21:00
Alcohol’s affects on the cornea and lens of the eye make it more difficult
Answers: 1
question
Computers and Technology, 24.06.2019 01:00
The initial tableau of a linear programming problem is given. use the simplex method to solve it. x 1 x 2 x 3 s 1 s 2 z 1 2 4 1 0 0 8 3 4 1 0 1 0 10 minus3 minus12 1 0 0 1 0 the maximum is nothing when x 1equals nothing, x 2equals nothing, x 3equals nothing, s 1equals3, and s 2equals0. (be sure to simplify to lowest terms if necessary.)
Answers: 2
question
Computers and Technology, 24.06.2019 13:00
In a heat transfer course, we can derive the equation for the temperature distribution in a flat rectangular plate. in this example, we will look at a plate at steadystate with three sides being held at t1, and one side held at t2. the temperature for any location on the plate, t(x,y), can be calculated by where create a function (prob3_5) that will take inputs of vectors x and y in feet, scalar n, scalars l and w in feet and scalars t1 and t2 in degrees fahrenheit. it will output a matrix t which is the temperature of each x and y locations. t will have the number of columns equal to the number of elements in x and rows equal to the number of elements in y. though this can be done without loops (perhaps more efficiently), your program must use a nested loop.
Answers: 2
You know the right answer?
Which statement is true with regard to project scheduling? A.
Scheduling in plan-based proc...
Questions
question
Social Studies, 10.12.2019 02:31
question
Mathematics, 10.12.2019 02:31
question
Social Studies, 10.12.2019 02:31
Questions on the website: 13722363