You are in charge of five software development projects. The ‘characteristics’ of each of your projects are as follows: • Project 1: Web-site for a local company. Relatively small system. Requirements are unclear and likely to change in the near future.

• Project 2: A very large embedded system whose requirements can be easily identified and are relatively stable.

• Project 3: A ‘standard’ business application. You have developed similar systems like this one in the past.

• Project 4: A relatively complex administrative system for one of the local hospitals. Some of the requirements seem to be pretty unclear, but all the requirements are stable.

• Project 5: A small real-time control system to be used for monitoring patients in a local hospital.

Consider the following software development approaches/models: waterfall, throw-away prototyping, evolutionary prototyping, component-based development, formal development. Which of the above approaches/models would you choose for each of your projects? Briefly explain your choices.

ansver
Answers: 1

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 15:00
Jake really works well with numbers and is skilled with computers but doesn't work well with others. which of the jobs discussed in this unit might be best for jake? why?
Answers: 3
question
Computers and Technology, 23.06.2019 20:30
Column a of irma’s spreadsheet contains titles for each row, but her document is too big and will be printed three pages across. she wants to be sure that every page will be understood. what can irma do to with this problem?
Answers: 3
question
Computers and Technology, 23.06.2019 21:40
Draw the resistor’s voltage and current phasors at t=15ms. draw the vectors with their tails at the origin. the orientation of your vectors will be graded. the exact length of your vectors will not be graded.
Answers: 2
question
Computers and Technology, 24.06.2019 00:30
Which boolean operator enables you to exclude a search term? a} not b} and c} or d} plus
Answers: 1
You know the right answer?
You are in charge of five software development projects. The ‘characteristics’ of each of your proje...
Questions
question
Mathematics, 13.10.2020 05:01