subject
Chemistry, 16.10.2019 21:30 bananaslada

The normal time for a work cycle in a worker-machine system is 6.27 min. for setting the standard time, the pfd allowance factor is 12%, and the machine allowance factor is 25%. the work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. determine (a) the standard time for the cycle and (b) the daily output at standard performance. (c) during an 8-hour shift, the worker lost 39 min due to personal time, rest breaks, and delays, and she produced 72 pieces. what was the worker's pace on the operator-controlled portion of the shift?

ansver
Answers: 2

Another question on Chemistry

question
Chemistry, 22.06.2019 20:20
The characteristics of two different types of reactions are shown below: reaction a: electrons are gained by the atoms of an element. reaction b: protons are lost by the atom of an element. which statement is true about the atoms of the elements that participate in the two reactions? their identity changes in both reaction a and reaction b. their identity changes in reaction a but not in reaction b. their identity changes in reaction b but not in reaction a. their identity remains the same in both reaction a and reaction b.
Answers: 1
question
Chemistry, 22.06.2019 23:30
Rank the following four acids in order of increasing bronsted acidity : h2f+ , ch3oh, (ch3)2oh+ , ch3sh2+
Answers: 3
question
Chemistry, 23.06.2019 07:30
How do you interpret a chromagram for what mixtures contain?
Answers: 1
question
Chemistry, 23.06.2019 08:00
If the solubility of a gas in water is 1.22 g/l at 2.75 atm, what is its solubility (in g/l) at 1.0 atm?
Answers: 1
You know the right answer?
The normal time for a work cycle in a worker-machine system is 6.27 min. for setting the standard ti...
Questions
question
English, 05.09.2020 14:01
question
Mathematics, 05.09.2020 14:01
Questions on the website: 13722363