Answers: 1
Business, 21.06.2019 21:20
Kahn company's static budget was based on sales volume of 12,000 units. its flexible budget was based on sales volume of 14,000 units. based on this information multiple choice the sales volume variance is expected to be unfavorable. the materials cost volume variance is expected to be favorable. the labor cost volume variance is expected to be unfavorable. none of the answers is correct.
Answers: 3
Business, 22.06.2019 01:10
Suppose someone wants to sell a piece of land for cash. the selling of a piece of land represents turning econ
Answers: 3
Business, 22.06.2019 05:50
Nichols inc. manufactures remote controls. currently the company uses a plantminuswide rate for allocating manufacturing overhead. the plant manager is considering switchingminusover to abc costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows: activities cost driver allocation rate material handling number of parts $5 per part assembly labor hours $20 per hour inspection time at inspection station $10 per minute the current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $20 per labor hour. what are the indirect manufacturing costs per remote control assuming an method is used and a batch of 10 remote controls are produced? the batch requires 100 parts, 5 direct manufacturing labor hours, and 3 minutes of inspection time.
Answers: 2
Business, 22.06.2019 06:30
If a seller prepaid the taxes of $4,400 and the closing is set for may 19, using the 12 month/30 day method what will the buyer owe the seller as prorated taxes?
Answers: 1
Juarez distribution company conducted a time study of martha smith's job as an installer. the differ...
Computers and Technology, 31.12.2019 04:31