subject
Business, 19.12.2021 21:10 ariannanykole1

Boise Cantor for $3,160,000. After the timber is cleared, the land will have a residual value of $610,000. Roads to enable logging operations were constructed and completed on March 30, 2021. The cost of the roads, which have no residual value and no alternative use after the tract is cleared, was $255,000. During 2021, Terra logged 510,000 of the estimated 5.1 million board feet of timber. Required: Calculate the 2021 depletion of the timber tract and depreciation of the logging roads assuming the units-of-production method is used for both assets

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 23:00
The monthly payment m of a loan of amount p for y years with an interest rate r can be calculated by the formula: m = p(r/12) 1 â’ (1 + r/12)â’12y calculate the monthly payment and the cummulative total payment for a $100,000 loan with an interest rate of 4.85% if taken out for 10 years, for 11 years, etc., up to a 30 year term. display the results in a three-column table where the first column is the number of years, the second is the monthly payment, and the third is the cummulative total payment. note: use format bank; for this problem. also, remember to represent the interest rate as a decimal (e.g. 0.0485) 2. a torus-shaped water tube is designed to have a volume of 8, 000in3 . the volume of the tube, v , and its surface area, s, are given by: v = 1 4 ď€ 2 (a + b)(b â’ a) 2 s = ď€ 2 (b 2 â’ a 2 ) if a = kb, determine s, a, and b for k = 0.2, 0.3, 0.7. display the results in a table
Answers: 1
question
Business, 22.06.2019 08:30
Sonic corp. manufactures ski and snowboarding equipment. it has estimated that this year there will be substantial growth in its sales during the winter months. it approaches the bank for credit. what is the purpose of such credit known as? a. expansion b. inventory building c. debt management d. emergency maintenance
Answers: 3
question
Business, 22.06.2019 12:50
Performance bicycle company makes steel and titanium handle bars for bicycles. it requires approximately 1 hour of labor to make one handle bar of either type. during the most recent accounting period, barr company made 7,700 steel bars and 2,300 titanium bars. setup costs amounted to $35,000. one batch of each type of bar was run each month. if a single company-wide overhead rate based on direct labor hours is used to allocate overhead costs to the two products, the amount of setup cost assigned to the steel bars will be:
Answers: 2
question
Business, 22.06.2019 17:00
Zeta corporation is a manufacturer of sports caps, which require soft fabric. the standards for each cap allow 2.00 yards of soft fabric, at a cost of $2.00 per yard. during the month of january, the company purchased 25,000 yards of soft fabric at $2.10 per yard, to produce 12,000 caps. what is zeta corporation's materials price variance for the month of january?
Answers: 2
You know the right answer?
Boise Cantor for $3,160,000. After the timber is cleared, the land will have a residual value of $61...
Questions
question
Mathematics, 19.11.2020 18:20
question
Social Studies, 19.11.2020 18:20
question
Mathematics, 19.11.2020 18:20
question
English, 19.11.2020 18:20
Questions on the website: 13722362