Business, 20.08.2021 01:10 genyjoannerubiera

It takes the Blacksburg shipyard twenty six weeks with 500 workers to build a small tanker. Material costs are $32 million and overhead costs are $2 million. Workers cost $40 per hour including benefits and work 40 hours per week. The ship sells for $75 million. What is the multifactor productivity ratio

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 17:40
Adamson company manufactures four lines of garden tools. as a result of an activity analysis, the accounting department has identified eight activity cost pools. each of the product lines is produced in large batches, with the whole plant devoted to one product at a time. classify each of the following activities or costs as either unit-level, batch-level, product-level, or facility-level. activities (a) machining parts. (b) product design. (c) plant maintenance. (d) machine setup. (e) assembling parts. (f) purchasing raw materials. (g) property taxes. (h) painting.
Answers: 2
question
Business, 22.06.2019 19:30
Problem page a medical equipment industry manufactures x-ray machines. the unit cost c (the cost in dollars to make each x-ray machine) depends on the number of machines made. if x machines are made, then the unit cost is given by the function =cx+−0.3x2126x31,935 . how many machines must be made to minimize the unit cost?
Answers: 3
question
Business, 22.06.2019 23:00
Acollege registrar's office requires you to first visit with one of three advisors and then with one of two financial professionals. this system best described as which of the following? a. single server, single phase systemb. multiple server multiphase systemc. multiple server, cross phase systemd. single server, multiphase systeme. multiple server, single phase system
Answers: 2
question
Business, 23.06.2019 00:10
Kcompany estimates that overhead costs for the next year will be $4,900,000 for indirect labor and $1,000,000 for factory utilities. the company uses direct labor hours as its overhead allocation base. if 100,000 direct labor hours are planned for this next year, what is the company's plantwide overhead rate?
Answers: 3
You know the right answer?
It takes the Blacksburg shipyard twenty six weeks with 500 workers to build a small tanker. Material...