Listed below are ways to reduce the critical path. This particular method should be considered carefully, and the project manager should review the original assumptions that guided the task estimate initially before proceeding.

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 11:30
10.     lucy is catering an important luncheon and wants to make sure her bisque has the perfect consistency. for her bisque to turn out right, it should have the consistency of a. cold heavy cream. b. warm milk. c. foie gras. d. thick oatmeal. student d   incorrect
Answers: 2
question
Business, 22.06.2019 19:00
What is an equation of the line in slope intercept formm = 4 and the y-intercept is (0,5)y = 4x-5y = -5x +4y = 4x + 5y = 5x +4
Answers: 1
question
Business, 22.06.2019 21:00
Mr. beautiful, an organization that sells weight training sets, has an ordering cost of $40 for the bb-1 set. (bb-1 stands for body beautiful number 1.) the carrying cost for bb-1 is $5 per set per year. to meet demand, mr. beautiful orders large quantities of bb-1 seven times a year. the stockout cost for bb-1 is estimated to be $50 per set. over the past several years, mr. beautiful has observed the following demand during the lead time for bb-1: demand during lead time probability40 0.150 0.260 0.270 0.280 0.290 0.1total 1.0the reorder point for bb-1 is 60 sets. what level of safety stock should be maintained for bb-1?
Answers: 3
question
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
You know the right answer?
Listed below are ways to reduce the critical path. This particular method should be considered caref...
Questions
question
History, 07.10.2019 01:10
question
Mathematics, 07.10.2019 01:10
Questions on the website: 13722362