subject
Business, 09.07.2021 16:40 payshencec21

SUPPOS A CHAIR MANUFACTURE IS PRODUCING IN THE SHORT RUN WHEN EQUIPMENT IS FIXED. THE MANUFACTURER KNOWS THAT AS THE NUMBER OF LABORES USED IN THE PRODUCTION PROCESS INCREASES FROM 1 TO 7 , THE NUMBER OF CHAIRS PRODUCED CHANGES AS FOLLOWS: 10,17,22,25,26,25,23. a) Calculate the marginal and average product of labor for this production function b) diminishing marginal product

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 00:30
Refers to the way we conduct ourselves
Answers: 2
question
Business, 22.06.2019 08:30
Uppose that the federal reserve purchases a bond for $100,000 from donald truck, who deposits the proceeds in the manufacturer’s national bank. what will be the impact of this purchase on the supply of money? the money supply will increase by $100,000. the money supply will increase by $80,000. the money supply will increase by $500,000. this action will have no effect on the money supply. if the reserve requirement ratio is 20 percent, what is the maximum amount of additional loans that the manufacturer’s bank will be able to extend as the result of truck’s deposit? the maximum additional loans is $100,000. the maximum additional loans is $80,000. the maximum additional loans is $20,000. the maximum additional loans is $500,000. given the 20 percent reserve requirement, what is the maximum increase in the quantity of checkable deposits that could result throughout the entire banking system because of the fed’s action? this action will have no effect on the money supply. the money supply will eventually increase by $80,000. the money supply will eventually increase by $500,000. the money supply will eventually increase by $100,000.
Answers: 1
question
Business, 22.06.2019 17:30
Emery pharmaceutical uses an unstable chemical compound that must be kept in an environment where both temperature and humidity can be controlled. emery uses 825 pounds per month of the chemical, estimates the holding cost to be 50% of the purchase price (because of spoilage), and estimates order costs to be $48 per order. the cost schedules of two suppliers are as follows: vendor 1 vendor 2 quantity price/lb quantity price/lb 1-499 $17 1-399 $17.10 500-999 $16.75 400-799 $16.85 1000+ $16.50 800-1199 $16.60 1200+ $16.25 (a) what is the economic order quantity for each supplier? (b) what quantity should be ordered and which supplier should be used? (c) the total cost for the most economic order sire is $
Answers: 2
question
Business, 22.06.2019 18:10
Ashop owner uses a reorder point approach to restocking a certain raw material. lead time is six days. usage of the material during lead time is normally distributed with a mean of 42 pounds and a standard deviation of four pounds. when should the raw material be reordered if the acceptable risk of a stockout is 3 percent?
Answers: 1
You know the right answer?
SUPPOS A CHAIR MANUFACTURE IS PRODUCING IN THE SHORT RUN WHEN EQUIPMENT IS FIXED. THE MANUFACTURER K...
Questions
question
Mathematics, 30.11.2021 20:20
question
Mathematics, 30.11.2021 20:20
Questions on the website: 13722363