subject
Business, 29.08.2019 00:30 manuellopez1981

The concept by which pay is distributed based on work produced rather than hours worked was called

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 20:40
Which of the following explains why the government sets a required reserve ratio for private banks? a. to allow the government to control the interest rate charged on loans. b. to prevent banks from printing too much money and causing inflation. c. to make sure banks don't run out of money when customers make withdrawals. d. to enable the regulation of risk levels in the decision process of offering loans. 2b2t
Answers: 1
question
Business, 22.06.2019 13:10
Laval produces lamps and home lighting fixtures. its most popular product is a brushed aluminum desk lamp. this lamp is made from components shaped in the fabricating department and assembled in the assembly department. information related to the 22,000 desk lamps produced annually follows.direct materials $280,000direct labor fabricating department (8,000 dlh Ă— $24 per dlh) $192,000assembly department (16,600 dlh Ă— $26 per dlh) $431,600machine hours fabricating department $15,200mhassembly department $20,850mhexpected overhead cost and related data for the two production departments follow.fabricating assemblydirect labor hours 150,000dlh 295,000dlhmachine hours 161,000mh 128,000mhoverhead cost $400,000 430,000required1. determine the plantwide overhead rate for laval using direct labor hours as a base.2. determine the total manufacturing cost per unit for the aluminum desk lamp using the plantwide overhead rate.3. compute departmental overhead rates based on machine hours in the fabricating department and direct labor hours in the assembly department.4. use departmental overhead rates from requirement 3 to determine the total manufacturing cost per unit for the aluminum desk lamps.
Answers: 3
question
Business, 22.06.2019 16:30
Corrective action must be taken for a project when (a) actual progress to the planned progress shows the progress is ahead of schedule. (b) the technical specifications have been met. (c) the actual cost of the activities is less than the funds received for the work completed. (d) the actual progress is less than the planned progress.
Answers: 2
question
Business, 22.06.2019 17:50
On january 1, eastern college received $1,350,000 from its students for the spring semester that it recorded in unearned tuition and fees. the term spans four months beginning on january 2 and the college spreads the revenue evenly over the months of the term. assuming the college prepares adjustments monthly, what amount of tuition revenue should the college recognize on february 28?
Answers: 2
You know the right answer?
The concept by which pay is distributed based on work produced rather than hours worked was called...
Questions
question
Mathematics, 16.10.2020 16:01
question
English, 16.10.2020 16:01
question
Mathematics, 16.10.2020 16:01
question
Mathematics, 16.10.2020 16:01
Questions on the website: 13722360