Appendix: Normal and Abnormal Spoilage in Process Costing Novel Toys, Inc., manufactures plastic water guns. Each gun's left and right frames are produced in the Molding Department. The left and right frames are then transferred to the Assembly Department where the trigger mechanism is inserted and the halves are glued together. (The left and right halves together define the unit of output for the Molding Department.) In June, the Molding Department reported the following data:
In the Molding Department, all direct materials are added at the beginning of the process.
Beginning work in process consisted of 3,000 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $450; and conversion costs, $138.
Costs added to production during the month were direct materials, $950; and conversion costs, $2,174.50.
Inspection takes place at the end of the process. Malformed units are discarded. All spoilage is considered abnormal.
During the month, 7,000 units were started, and 8,000 good units were transferred out to Finishing. All other units finished were malformed and discarded. There were 1,000 units that remained in ending work in process, 25 percent complete.
Required:
1. Prepare a physical flow schedule.
Novel Toys, Inc.
Physical Flow Schedule
Units to account for:
Units, beginning work in process
Units started
Total units to account for
Units accounted for:
Units transferred out
Units spoiled
Units, ending work in process
Total units accounted for
Feedback
1. The physical flow schedule traces the units in process regardless of their stage of completion.
2. Calculate equivalent units of production using the weighted average method.
Equivalent Units
Direct Materials
Conversion Costs
3. Calculate the unit cost. Round your answer to the nearest cent.
$ per unit
4. What is the cost of goods transferred out?
$
What is the ending work in process? Round your answer to the nearest cent.
$
What is the loss due to spoilage?
$
Feedback
2. To calculate equivalent units, weighted average counts prior-period output in BWIP as belonging to the current period. All units are output in the current period.
3. The unit cost is obtained by dividing the sum of the costs in BWIP and the current-period costs by the weighted average equivalent output.
4. Costing out ending work in process is done by computing the cost of each input and then adding to obtain the total. The valuation of cost of goods transferred out is simplified as it is the total unit cost multiplied by the units completed.
5. Prepare the journal entry to remove spoilage from the Molding Department.
Loss from Abnormal Spoilage
Work in Process-Molding

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:30
White company has two departments, cutting and finishing. the company uses a job-order costing system and computes a predetermined overhead rate in each department. the cutting department bases its rate on machine-hours, and the finishing department bases its rate on direct labor-hours. at the beginning of the year, the company made the following estimates: department cutting finishing direct labor-hours 6,000 30,000 machine-hours 48,000 5,000 total fixed manufacturing overhead cost $ 264,000 $ 366,000 variable manufacturing overhead per machine-hour $ 2.00 " variable manufacturing overhead per direct labor-hour " $ 4.00 required: 1. compute the predetermined overhead rate for each department. 2. the job cost sheet for job 203, which was started and completed during the year, showed the following: department cutting finishing direct labor-hours 6 20 machine-hours 80 4 direct materials $ 500 $ 310 direct labor cost $ 108 $ 360 using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to job 203. 3. would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?
Answers: 3
question
Business, 22.06.2019 03:00
In the supply-and-demand schedule shown above, at the lowest price of $50, producers supply music players and consumers demand music players.
Answers: 2
question
Business, 22.06.2019 09:00
Consider the scenario below and let us know if you believe lauren smith's actions to be ethical. let us know why or why not. lauren smith is the controller for sports central, a chain of sporting goods stores. she has been asked to recommend a site for a new store. lauren has an uncle who owns a shopping plaza in the area of town where the new store is to be located, so she decides to contact her uncle about leasing space in his plaza. lauren also contacted several other shopping plazas and malls, but her uncle’s store turned out to be the most economical place to lease. therefore, lauren recommended locating the new store in her uncle’s shopping plaza. in making her recommendation to management, she did not disclose that her uncle owns the shopping plaza. if management decided to go with lauren's uncle's plaza, what additional information would be needed in the financial statements?
Answers: 2
question
Business, 22.06.2019 10:30
The advertisement demonstrates a popular way companies try to sell a product. what should consumers consider when it comes to the price of this product? it includes shipping and handling costs. it takes into account maintenance costs. it explains why this price is a good deal. it makes the full cost appears lower than it is.
Answers: 1
You know the right answer?
Appendix: Normal and Abnormal Spoilage in Process Costing Novel Toys, Inc., manufactures plastic wa...
Questions
question
Health, 24.01.2021 21:30
question
Mathematics, 24.01.2021 21:30
question
Mathematics, 24.01.2021 21:30
Questions on the website: 13722363