subject
Business, 16.02.2021 01:00 BrookLPrescott287

Bims Corporation uses the weighted-average method in its process costing system. The Assembly Department started the month with 2,000 units in its beginning work in process inventory that were 70% complete with respect to conversion costs. An additional 61,000 units were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 18,000 units in the ending work in process inventory of the Assembly Department that were 60% complete with respect to conversion costs. What were the equivalent units for conversion costs in the Assembly Department for the month

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 06:30
73. calculate the weighted average cost of capital (wacc) based on the following information: the equity multiplier is 1.66; the interest rate on debt is 13%; the required return to equity holders is 22%; and the tax rate is 35%. (a) 15.6% (b) 16.0% (c) 15.0% (d) 16.6% (e) none of the above
Answers: 2
question
Business, 22.06.2019 08:10
Bakery has bought 250 pounds of muffin dough. they want to make waffles or muffins in half-dozen packs out of it. half a dozen of muffins requires 1 lb of dough and a pack of waffles uses 3/4 lb of dough. it take bakers 6 minutes to make a half-dozen of waffles and 3 minutes to make a half-dozen of muffins. their profit will be $1.50 on each pack of waffles and $2.00 on each pack of muffins. how many of each should they make to maximize profit, if they have just 20 hours to do everything?
Answers: 3
question
Business, 22.06.2019 13:10
The textbook defines ethics as “the principles of conduct governing an individual or a group,” and specifically as the standards one uses to decide what their conduct should be. to what extent do you believe that what happened at bp (british petrolium) is as much a breakdown in the company’s ethical systems as it is in its safety systems, and how would you defend your conclusion?
Answers: 2
question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
You know the right answer?
Bims Corporation uses the weighted-average method in its process costing system. The Assembly Depart...
Questions
question
Social Studies, 29.07.2019 10:20
Questions on the website: 13722367