Business, 11.02.2021 22:00 jodiisbored2621

Sigma Corporation applies overhead cost to jobs on the basis of direct labor cost. Job V, which was started and completed during the current period, shows charges of $6,000 for direct materials, $9,900 for direct labor, and $7,128 for overhead on its job cost sheet. Job W, which is still in process at year-end, shows charges of $3,000 for direct materials and $4,900 for direct labor. Required:
Calculate the overhead cost be added to Job W at year-end

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:00
Following is a list of various costs incurred in producing replacement automobile parts. with respect to the production and sale of these auto parts, classify each cost as either variable costs, fixed costs, or mixed costs. 1. oil used in manufacturing equipment 2. plastic 3. property taxes, $165,000 per year on factory building and equipment 4. salary of plant manager 5. cost of labor for hourly workers 6. packaging 7. factory cleaning costs, $6,000 per month 8. metal 9. rent on warehouse, $10,000 per month plus $25 per square foot of storage used 10. property insurance premiums, $3,600 per month plus $0.01 for each dollar of property over $1,200,000 11. straight-line depreciation on the production equipment 12. hourly wages of machine operators 13. electricity costs, $0.20 per kilowatt-hour 14. computer chip (purchased from a vendor) 15. pension cost, $1.00 per employee hour on the job
Answers: 3
question
Business, 22.06.2019 05:50
Nichols inc. manufactures remote controls. currently the company uses a plantminuswide rate for allocating manufacturing overhead. the plant manager is considering switchingminusover to abc costing system and has asked the accounting department to identify the primary production activities and their cost drivers which are as follows: activities cost driver allocation rate material handling number of parts $5 per part assembly labor hours $20 per hour inspection time at inspection station $10 per minute the current traditional cost method allocates overhead based on direct manufacturing labor hours using a rate of $20 per labor hour. what are the indirect manufacturing costs per remote control assuming an method is used and a batch of 10 remote controls are produced? the batch requires 100 parts, 5 direct manufacturing labor hours, and 3 minutes of inspection time.
Answers: 2
question
Business, 22.06.2019 07:30
Jewelry manufacturers produce a range of products such as rings, necklaces, bracelets, and brooches. what fundamental economic question are they addressing by offering this range of items?
Answers: 3
question
Business, 22.06.2019 11:00
Down under products, ltd., of australia has budgeted sales of its popular boomerang for the next four months as follows: unit salesapril 74,000may 85,000june 114,000july 92,000the company is now in the process of preparing a production budget for the second quarter. past experience has shown that end-of-month inventory levels must equal 10% of the following month’s unit sales. the inventory at the end of march was 7,400 units.required: prepare a production budget by month and in total, for the second quarter.
Answers: 3
You know the right answer?
Sigma Corporation applies overhead cost to jobs on the basis of direct labor cost. Job V, which was...
Questions
question
Mathematics, 07.02.2022 03:20
question
English, 07.02.2022 03:20
question
Mathematics, 07.02.2022 03:20
question
Mathematics, 07.02.2022 03:20
question
Mathematics, 07.02.2022 03:20
Questions on the website: 13722366