subject
Business, 09.02.2021 01:00 candancejc8942

Marigold Corp. thinks machine hours is the best activity base for its manufacturing overhead. The estimate of annual overhead costs for its jobs was $1550000. The company used 1000 hours of processing on Job No. B12 during the period and incurred overhead costs totaling $1600000. The budgeted machine hours for the year totaled 20000. How much overhead should be applied to Job No. B12

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 23:00
The monthly payment m of a loan of amount p for y years with an interest rate r can be calculated by the formula: m = p(r/12) 1 â’ (1 + r/12)â’12y calculate the monthly payment and the cummulative total payment for a $100,000 loan with an interest rate of 4.85% if taken out for 10 years, for 11 years, etc., up to a 30 year term. display the results in a three-column table where the first column is the number of years, the second is the monthly payment, and the third is the cummulative total payment. note: use format bank; for this problem. also, remember to represent the interest rate as a decimal (e.g. 0.0485) 2. a torus-shaped water tube is designed to have a volume of 8, 000in3 . the volume of the tube, v , and its surface area, s, are given by: v = 1 4 ď€ 2 (a + b)(b â’ a) 2 s = ď€ 2 (b 2 â’ a 2 ) if a = kb, determine s, a, and b for k = 0.2, 0.3, 0.7. display the results in a table
Answers: 1
question
Business, 22.06.2019 16:00
In microeconomics, the point at which supply and demand meet is called the blank price
Answers: 3
question
Business, 22.06.2019 20:00
If a government accumulates chronic budget deficits over time, what's one possible result? a. a collective action problem b. a debt crisis c. regulatory capture d. an unfunded liability
Answers: 2
question
Business, 22.06.2019 22:00
Suppose that a paving company produces paved parking spaces (q) using a fixed quantity of land (t) and variable quantities of cement (c) and labor (l). the firm is currently paving 1,000 parking spaces. the firm's cost of cement is $3 comma 600.003,600.00 per acre covered (c) and its cost of labor is $35.0035.00/hour (w). for the quantities of c and l that the firm has chosen, mp subscript upper c baseline equals 60mpc=60 and mp subscript upper l baseline equals 7mpl=7. is this firm minimizing its cost of producing parking spaces?
Answers: 3
You know the right answer?
Marigold Corp. thinks machine hours is the best activity base for its manufacturing overhead. The es...
Questions
question
Advanced Placement (AP), 09.06.2021 09:30
question
History, 09.06.2021 09:30
question
History, 09.06.2021 09:30
Questions on the website: 13722367