Milner Company is working on two job orders. The job cost sheets show the following. Assign costs to work in process. Job 201 Job 202
Direct materials $7,200 $9,000
Direct labor 4,000 8,000
Manufacturing overhead 5,200 9,800

Required:
Prepare the three summary entries to record the assignment of costs to Work in Process from the data on the job cost sheets.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 08:40
Calculate the cost of each capital component—in other words, the after-tax cost of debt, the cost of preferred stock (including flotation costs), and the cost of equity (ignoring flotation costs). use both the capm method and the dividend growth approach to find the cost of equity.calculate the cost of new stock using the dividend growth approach.what is the cost of new common stock based on the capm? (hint: find the difference between re and rs as determined by the dividend growth approach and then add that difference to the capm value for rs.)assuming that gao will not issue new equity and will continue to use the same target capital structure, what is the company’s wacc? e. suppose gao is evaluating three projects with the following characteristics.each project has a cost of $1 million. they will all be financed using the target mix of long-term debt, preferred stock, and common equity. the cost of the common equity for each project should be based on the beta estimated for the project. all equity will come from reinvested earnings.equity invested in project a would have a beta of 0.5 and an expected return of 9.0%.equity invested in project b would have a beta of 1.0 and an expected return of 10.0%.equity invested in project c would have a beta of 2.0 and an expected return of 11.0%.analyze the company’s situation, and explain why each project should be accepted or rejected g
Answers: 1
question
Business, 22.06.2019 18:50
Plastic and steel are substitutes in the production of body panels for certain automobiles. if the price of plastic increases, with other things remaining the same, we would expect: a) the demand curve for plastic to shift to the left. b) the price of steel to fall. c) the demand curve for steel to shift to the left d) nothing to happen to steel because it is only a substitute for plastic. e) the demand curve for steel to shift to the right
Answers: 3
question
Business, 22.06.2019 21:10
You are the manager of a large crude-oil refinery. as part of the refining process, a certain heat exchanger (operated at high temperatures and with abrasive material flowing through it) must be replaced every year. the replacement and downtime cost in the first year is $165 comma 000. this cost is expected to increase due to inflation at a rate of 7% per year for six years (i.e. until the eoy 7), at which time this particular heat exchanger will no longer be needed. if the company's cost of capital is 15% per year, how much could you afford to spend for a higher quality heat exchanger so that these annual replacement and downtime costs could be eliminated?
Answers: 1
question
Business, 22.06.2019 23:20
Nnette henri is paid an hourly wage of $8.90 for a 32-hour workweek of 4 days, 8 hours daily. for any work on the fifth day and on saturdays, she is paid one and one-half times her regular hourly rate. during a certain week, in addition to her regular 32 hours, henri worked 6 hours on the fifth day and 5 hours on saturday. for this workweek, henri’s total earnings are:
Answers: 1
You know the right answer?
Milner Company is working on two job orders. The job cost sheets show the following. Assign costs to...
Questions
question
Chemistry, 25.01.2022 02:50
question
Mathematics, 25.01.2022 02:50
question
Chemistry, 25.01.2022 02:50
question
Mathematics, 25.01.2022 02:50
Questions on the website: 13722363