subject
Business, 21.10.2020 16:01 keke6361

The same grade of cemented carbide tooling is available in two forms for turning operations in the machine shop: disposable inserts and brazed inserts. Feed = 0.30 mm/rev. The Taylor equation parameters for this grade are n = 0.25 and C = 300 (m/min). For the disposable inserts, the price of each insert = $6.00, there are four cutting edges per insert, and the average tool change time = 1.0 min. Forthe brazed insert, the price of the tool = $30.00, and it can be used a total of 15 times before it must be scrapped. The tool change time forthe regrindable tooling = 3.0min. The standardtime to grind orregrind the cutting edge is 5.0min, and the cost rate to grind = $20.00/hr. Machine time on the lathe costs $24.00/hr. The work part to be used in the comparison is 375 mm long and 62.5 mm in diameter, and it takes 2.0 min to load and unload the work. For the two cases, compare the: a. cutting speedsfor minimum cost b. tool lives c. cycle times and costs per unit of production. d. Which tool would you recommend?

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 02:30
The monthly sales for yazici​ batteries, inc., were as​ follows: month jan feb mar apr may jun jul aug sept oct nov dec sales 19 20 17 12 11 18 16 17 19 22 21 24 this exercise contains only parts b and c. ​b) the forecast for the next month​ (jan) using the naive method​ = nothing sales ​(round your response to a whole​ number). the forecast for the next period​ (jan) using a​ 3-month moving average approach​ = nothing sales ​(round your response to two decimal​ places). the forecast for the next period​ (jan) using a​ 6-month weighted average with weights of 0.10​, 0.10​, 0.10​, 0.20​, 0.20​, and 0.30​, where the heaviest weights are applied to the most recent month​ = nothing sales ​(round your response to one decimal​ place). using exponential smoothing with alpha ​= 0.40 and a september forecast of 21.00​, the forecast for the next period​ (jan) = nothing sales ​(round your response to two decimal​ places). using a method of trend​ projection, the forecast for the next month​ (jan) = nothing sales ​(round your response to two decimal​ places). ​c) the method that can be used for making a forecast for the month of march is ▾ a 3-month moving average a 6-month weighted moving average exponential smoothing the naive method a trend projection .
Answers: 2
question
Business, 22.06.2019 12:50
Suppose the real risk-free rate and inflation rate are expected to remain at their current levels throughout the foreseeable future. consider all factors that affect the yield curve. then identify which of the following shapes that the u.s. treasury yield curve can take. check all that apply.
Answers: 2
question
Business, 22.06.2019 16:00
Analyzing and computing accrued warranty liability and expense waymire company sells a motor that carries a 60-day unconditional warranty against product failure. from prior years' experience, waymire estimates that 2% of units sold each period will require repair at an average cost of $100 per unit. during the current period, waymire sold 69,000 units and repaired 1,000 units. (a) how much warranty expense must waymire report in its current period income statement? (b) what warranty liability related to current period sales will waymire report on its current period-end balance sheet? (hint: remember that some units were repaired in the current period.) (c) what analysis issues must we consider with respect to reported warranty liabilities?
Answers: 1
question
Business, 22.06.2019 19:30
One of the benefits of a well designed ergonomic work environment is low operating costs is true or false
Answers: 3
You know the right answer?
The same grade of cemented carbide tooling is available in two forms for turning operations in the m...
Questions
Questions on the website: 13722363