Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $128,800 of manufacturing overhead for an estimated allocation base of $92,000 direct material dollars to be used in production. The company has provided the following data for the just completed year: Purchase of raw materials $ 136,000
Direct labor cost $ 88,000
Manufacturing overhead costs:
Indirect labor $ 136,100
Property taxes $ 8,200
Depreciation of equipment $ 19,000
Maintenance $ 12,000
Insurance $ 7,400
Rent, building $ 32,000
Beginning Ending
Raw Materials $ 27,000 $ 13,000
Work in Process $ 49,000 $ 37,000
Finished Goods $ 69,000 $ 55,000
Required:
1. Compute the predetermined overhead rate for the year.
2. Compute the amount of underapplied or overapplied overhead for the year.
3. Prepare a schedule of cost of goods manufactured for the year. Assume all raw materials are used in production as direct materials.
4. Compute the unadjusted cost of goods sold for the year. Do not include any underapplied or overapplied overhead in your answer.
5. Assume that the $37,000 ending balance in Work in Process includes $8,000 of direct materials. Given this assumption, supply the information missing below:
Required 1 Required 2 Required 3 Required 4 Required 5
Compute the predetermined overhead rate for the year. 19% redetermined overhead rate

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 01:30
Iam trying to get more members on my blog. how do i do this?
Answers: 3
question
Business, 22.06.2019 18:00
Rosie and her brother michael decided recently to purchase an rv together. they both want to use the rv to take their families camping. the price of the rv was $10,000. since michael expects to use the rv 60% of the time and rosie 40% of the time, michael contributed $6,000 and rosie contributed $4,000. their ownership percentage equals their contribution percentage. which type of property titling should they use to reflect their ownership interest?
Answers: 1
question
Business, 22.06.2019 22:40
Utilization will always be lower than efficiency because: a. effective capacity is greater than design capacityb. expected output is less than actual output.c. effective capacity equals design capacity.d. effective capacity is less than design capacity.e. expected output is less than rated capacity.
Answers: 3
question
Business, 23.06.2019 00:00
An attorney came to work on a saturday. when he signed in, he was advised by the morning security guard employed by the building management that he must be out of the building by 5 p.m., when it closes. however, he stayed past 5 p.m. to complete a brief that had to be filed on monday morning. at 5: 15 p.m., the afternoon security guard set the locks on all the doors of the building and left. because she was in a hurry, she did not check the sign-in sheet to make sure that everyone had signed out, contrary to mandatory procedures. when the attorney tried to exit 15 minutes later, he discovered that the doors were all locked and could not be opened from the inside. he used his cell phone to call for , and a supervisor from the building arrived and let him out shortly thereafter. if the attorney sues the building management for false imprisonment, is he likely to win?
Answers: 1
You know the right answer?
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis o...
Questions
question
Mathematics, 16.04.2021 22:30
question
Biology, 16.04.2021 22:30
question
Mathematics, 16.04.2021 22:30
question
Mathematics, 16.04.2021 22:30
question
Chemistry, 16.04.2021 22:30
Questions on the website: 13722363