subject
Business, 20.09.2020 14:01 journeywalker19

During its most recent period, Raymond Manufacturing expected Job No. 59 to cost $600,000 of overhead, $1,000,000 of materials, and $400,000 in labor. Raymond applied overhead based on direct labor cost. Actual production required an overhead cost of $590,000, $1,140,000 in materials used, and $440,000 in labor. All of the goods were completed. How much is the amount of over- or underapplied overhead?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 10:00
Employees at a library check out books to patrons. books have an isbn and a name. the library sometimes has multiple copies of the same book. books have one or more authors. a patron is an individual who has an active (non-expired) library card. for each library card, we store the person's first and last names and their address. for each employee, we store their employee id, current salary, first and last name and their address. we also store the employee id of their current manager. each time we check out a book to a patron we need to store the date of the transaction, the employee who checked out the book to the patron, and the library card of the patron. some employees have library cards. if an employee patron turns in a book late, the fine that they pay is a percentage of their salary. some employees are authors who have library cards—they are allowed to check out as many books as they like.
Answers: 1
question
Business, 22.06.2019 13:00
Explain the relationship between consumers and producers in economic growth and activity
Answers: 1
question
Business, 22.06.2019 15:30
Susan is a 5th grade teacher and loves getting up every day and going to work to teach her students. this is an example of a. extrinsic value b. interests c. intrinsic value d. external value
Answers: 2
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
You know the right answer?
During its most recent period, Raymond Manufacturing expected Job No. 59 to cost $600,000 of overhea...
Questions
Questions on the website: 13722362