subject
Business, 28.07.2020 19:01 cassidy32504

Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company is budgeted for the year at $1,039,600, divided into four activity pools: fabrication,, $448,000; assembly, $180,000; setup, $222,600; and inspection, $189,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The activity-base usage quantities for each product by each activity are as follows:
Fabrication Assembly Setup Inspection
Speedboat 7,000 dlh 22,500 dlh 50 setups 88 inspections
Bass boat 21,000 7,500 370 612
28,000 dlh 30,000 dlh 420 setups 700 inspections
Each product is budgeted for 5,000 units of production for the year.
a. Determine the activity rates for each activity.
Fabrication $ per direct labor hour
Assembly $ per direct labor hour
Setup $ per setup
Inspection $ per inspection
b. Determine the activity-based factory overhead per unit for each product. Round to the nearest whole dollar.
Speedboat $ per unit
Bass boat $ per unit

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 11:50
Select the correct answer. ramon applied to the state university in the city where he lives, but he was denied admission. what should he do now? a.change his mind about graduating and drop out of high school so he can start working right away. b. decide not to go to college, because he didn’t have a backup plan. c.stay positive and write a mean letter to let the college know that they made a bad decision. d. learn from this opportunity, reevaluate his options, and apply to his second and third choices.
Answers: 2
question
Business, 22.06.2019 15:30
For a firm that uses the weighted average method of process costing, which of the following must be true? (a) physical units can be greater than or less than equivalent units. (b) physical units must be equal to equivalent units. (c) equivalent units must be greater than or equal to physical units. (d) physical units must be greater than or equal to equivalent units.
Answers: 1
question
Business, 22.06.2019 22:30
When the price is the equilibrium price, we would expect there to be a causing the market to put pressure on the price until it went back to the equilibrium price. a. above; surplus; upward b. above; shortage; downward c. below; surplus; upward d. below; shortage; downward e. above; surplus; downward?
Answers: 2
question
Business, 22.06.2019 23:00
Abeverage company puts game pieces under the caps of its drinks and claims that one in six game pieces wins a prize. the official rules of the contest state that the odds of winning a prize are is the claim "one in six game pieces wins a prize" correct? why or why not? 1: 6.
Answers: 1
You know the right answer?
Activity-Based Costing: Factory Overhead Costs The total factory overhead for Bardot Marine Company...
Questions
question
Mathematics, 16.11.2020 17:20
question
Mathematics, 16.11.2020 17:20
Questions on the website: 13722363