The following is a description of the conversion cycle of Central Production Limited: The conversion cycle of the company is triggered by a report from the warehouse. When the quantity of an inventory item falls below a pre-set minimum level, the warehouse manager sends an online inventory status report to production department advising them to schedule a production batch run for the item.
Upon receipt of the report, the production clerk assesses the digital bill of materials and the route sheet files for the item to be produced and adds the production details to the online production schedule.
The system automatically adds a record to the open work order file and sends an online work order to the work centre supervisor’s computer and to the accounting clerk’s computer.
The work centre supervisor receives the work order from his computer and print hard-copy move tickets and materials requisitions for each production process. Production employees take the materials requisitions to store clerk and receives the materials and subassemblies needed to perform the production tasks. If additional materials beyond the standard amount is needed, the work centre supervisor prepares additional materials requisitions.
Production employees complete job time tickets after completing a production process to record the time spent on the job. The job time tickets are then sent together with the move tickets to the accounting department.
After releasing the materials into production, the store clerk updates the material inventory records and send the materials requisitions to accounting department. The clerk prepares a journal voucher and posts to the general ledger material control account at the end of each day.
The accounting clerk assesses the work orders and set up a work-in-process account for a production batch. Throughout the production period, the clerk also receives move tickets, job tickets, and materials requisitions, which he uses to post to the work-in-process account. At the end of each day, the accounting clerk prepares a digital journal voucher and post it to the general ledger work-in- process and finished goods control accounts.
Identify the risks exist in the conversion cycle of Central Production Limited. (10 marks, maximum 300 words)

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:00
Stephen barrett,md previous writing experience ?
Answers: 1
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
question
Business, 22.06.2019 20:00
Question 6 of 102 pointswhich situation shows a constant rate of change? oa. the number of tickets sold compared with the number of minutesbefore a football gameob. the height of a bird over timeoc. the cost of a bunch of grapes compared with its weightod. the outside temperature compared with the time of day
Answers: 1
question
Business, 22.06.2019 20:00
Which of the following is a competitive benefit experienced by the first mover firm in an industry? a. the first mover will be able to achieve a less steep learning curve. b. the first mover will be able to reduce the switching costs. c. the first mover will not have to patent its products or technology. d. the first mover will be able to reduce costs through economies of scale.
Answers: 3
You know the right answer?
The following is a description of the conversion cycle of Central Production Limited: The conversio...
Questions
question
Medicine, 16.12.2020 18:50
question
Mathematics, 16.12.2020 18:50
question
Chemistry, 16.12.2020 18:50
Questions on the website: 13722359