subject
Business, 05.05.2020 06:28 salsa456

A company is considering replacing an old piece of machinery, which cost $599,900 and has $352,700 of accumulated depreciation to date, with a new machine that has a purchase price of $483,400. The old machine could be sold for $64,900. The annual variable production costs associated with the old machine are estimated to be $156,800 per year for eight years. The annual variable production costs for the new machine are estimated to be $100,900 per year for eight years. a.1 Prepare a differential analysis dated September 13, to determine whether to continue with (Alternative 1) or replace (Alternative 2) the old machine. If an amount is zero, enter "0". For those boxes in which you must enter subtracted or negative numbers use a minus sign.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 19:50
Which of the following would create the most money? the initial deposit is $6,500 and the required reserve ratio is 20 percent. the initial deposit is $3,000 and the required reserve ratio is 10 percent. the initial deposit is $7,500 and the required reserve ratio is 25 percent. the initial deposit is $4,500 and the required reserve ratio is 15 percent.
Answers: 1
question
Business, 22.06.2019 20:50
Barbara flynn is in charge of maintaining hospital supplies at general hospital. during the past year, the mean lead time demand for bandage bx-5 was 65 (and was normally distributed). furthermore, the standard deviation for bx-5 was 6. ms. flynn would like to maintain a 90% service level.refer to the standard normal table for z-values.a) what safety stock level do you recommend for bx-5? safety stock=)what is the appropriate reorder point? reorder point=
Answers: 1
question
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
question
Business, 23.06.2019 00:00
The gorman group is a financial planning services firm owned and operated by nicole gorman. as of october 31, 2016, the end of the fiscal year, the accountant for the gorman group prepared an end-of-period spreadsheet, part of which follows:
Answers: 2
You know the right answer?
A company is considering replacing an old piece of machinery, which cost $599,900 and has $352,700 o...
Questions
question
Mathematics, 09.10.2019 00:00
question
Mathematics, 09.10.2019 00:00
question
History, 09.10.2019 00:00
Questions on the website: 13722367