subject
Business, 22.04.2020 01:10 RayshawnBoulware

A company's planned activity level for next year is expected to be 100,000 machine hours. At this level of activity, the company budgeted the following manufacturing overhead costs:Variable Fixed Indirect materials $120,000 Depreciation $50,000Indirect labor 160,000 Taxes 10,000Factory supplies 20,000 Supervision 40,000Required:If a flexible budget is prepared at the 90,000 machine hours level of activity, what would be the total manufacturing overhead costs?

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 19:30
Vulcan company is a monthly depositor whose tax liability for march 2019 is $2,510. 1. what is the due date for the deposit of these taxes? march 17 2. assume that no deposit was made until april 29. compute the following penalties. assume a 365-day year in your computations. round your answers to the nearest cent. a. penalty for failure to make timely deposits. $ b. penalty for failure to fully pay employment taxes $ c. interest on late payment (assume a 5% interest rate). $ d. total penalty imposed $
Answers: 3
question
Business, 22.06.2019 08:30
Hi inr 2002 class! i just uploaded a detailed study guide for this class. you can check-out a free preview by following the link below feel free to reach-out to me if you need a study buddy or have any questions. goodluck!
Answers: 1
question
Business, 22.06.2019 19:50
Statistical process control charts: a. indicate to the operator the true quality of material leaving the process. b. display upper and lower limits for process variables or attributes and signal when a process is no longer in control. c. indicate to the process operator the average outgoing quality of each lot. d. display the measurements on every item being produced. e. are a graphic way of classifying problems by their level of importance, often referred to as the 80-20 rule.
Answers: 2
question
Business, 22.06.2019 20:30
Almeda products, inc., uses a job-order costing system. the company's inventory balances on april 1, the start of its fiscal year, were as follows:
Answers: 2
You know the right answer?
A company's planned activity level for next year is expected to be 100,000 machine hours. At this le...
Questions
question
Mathematics, 19.02.2020 05:59
question
Mathematics, 19.02.2020 05:59
Questions on the website: 13722367