subject
Business, 17.04.2020 00:43 dtilton2003

In the short run, firms will . A. incur an economic loss B. continue to break even C. make an economic profit Some firms will the market, and the market supply curve will shift . A. enter; rightward B. enter; leftward C. exit; rightward D. exit; leftward

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 23:00
The monthly payment m of a loan of amount p for y years with an interest rate r can be calculated by the formula: m = p(r/12) 1 â’ (1 + r/12)â’12y calculate the monthly payment and the cummulative total payment for a $100,000 loan with an interest rate of 4.85% if taken out for 10 years, for 11 years, etc., up to a 30 year term. display the results in a three-column table where the first column is the number of years, the second is the monthly payment, and the third is the cummulative total payment. note: use format bank; for this problem. also, remember to represent the interest rate as a decimal (e.g. 0.0485) 2. a torus-shaped water tube is designed to have a volume of 8, 000in3 . the volume of the tube, v , and its surface area, s, are given by: v = 1 4 ď€ 2 (a + b)(b â’ a) 2 s = ď€ 2 (b 2 â’ a 2 ) if a = kb, determine s, a, and b for k = 0.2, 0.3, 0.7. display the results in a table
Answers: 1
question
Business, 22.06.2019 17:00
Zeta corporation is a manufacturer of sports caps, which require soft fabric. the standards for each cap allow 2.00 yards of soft fabric, at a cost of $2.00 per yard. during the month of january, the company purchased 25,000 yards of soft fabric at $2.10 per yard, to produce 12,000 caps. what is zeta corporation's materials price variance for the month of january?
Answers: 2
question
Business, 22.06.2019 19:40
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
question
Business, 23.06.2019 18:30
At december 31, 2018, newman engineering’s liabilities include the following: $29 million of 5% bonds were issued for $29 million on may 31, 1999. the bonds mature on may 31, 2029, but bondholders have the option of calling (demanding payment on) the bonds on may 31, 2019. however, the option to call is not expected to be exercised, given prevailing market conditions. $33 million of 4% notes are due on may 31, 2022. a debt covenant requires newman to maintain current assets at least equal to 194% of its current liabilities. on december 31, 2018, newman is in violation of this covenant. newman obtained a waiver from national city bank until june 2019, having convinced the bank that the company’s normal 2 to 1 ratio of current assets to current liabilities will be reestablished during the first half of 2019. $26 million of 7% bonds were issued for $26 million on august 1, 1989. the bonds mature on july 31, 2019. sufficient cash is expected to be available to retire the bonds at maturity. required: classify the above mentioned debts as current liabilities or noncurrent liabilities. also, provide corresponding value for the same. (enter your answer in millions (i.e., 10,000,000 should be entered as
Answers: 2
You know the right answer?
In the short run, firms will . A. incur an economic loss B. continue to break even C. make an econom...
Questions
question
Mathematics, 29.07.2020 04:01
question
Mathematics, 29.07.2020 04:01
Questions on the website: 13722365