subject
Business, 10.04.2020 00:45 mariateamop

The river near a town with a population of 150, 000 (note: not the town of Waterville above) has a very big flow rate to allow the town to build a new DWTP. The surface water quality is as follows: (1) average TSS of 10000 mg/L; (2) 35 mg/L of calcium bicarbonate and 20 mg/L of magnesium bicarbonate; and (3) during the spring runoff season, the river may be contaminated by low concentrations of synthetic organics (such as atrazine). Assuming you are hired by the town as an engineer to design a DWTP with an average flow in the design year being 50 MGD.

Requirements:
Do your design based on the design year only by (1) identifying the treatment train of the new DWTP that uses the river water as its supply; (2) identifying the locations where chemicals are added (but not their quantities); and (3) sizing your major reactors that are located before the disinfection process. For example, if you have rapid mixing tanks, flocculation tanks, and sand filters, you need to calculate their sizes, but don’t need to get into the design details (e. g., design of paddle wheels, sand filter underdrain system, clean sand head loss, backwash hydraulics, etc.). In addition, you don’t need to include the design of the pumping station, bar rack design, clear well design because they will be designed by the other engineers in your group.

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 21:00
While studying for the engineering economy final exam, you and two friends find yourselves craving a fresh pizza. you can't spare the time to pick up the pizza and must have it delivered. "pick-up-sticks" offers a 1-1/4-inch-thick (including toppings), 20-inch square pizza with your choice of two toppings for $15 plus 5% sales tax and a $1.50 delivery charge (no sales tax on delivery charge). "fred's" offers the round, deep-dish sasquatch, which is 20 inches in diameter. it is 1-3/4 inches thick, includes two toppings, and costs $17.25 plus 5% sales tax and free delivery. 1. what is the problem in this situation? state it in an explicit and precise manner. 2. systematically apply the seven principles of engineering economy (pp. 3-6) to the problem you have defined in part (a). 3. assuming that your common unit of measure is dollars (i.e., cost), what is the better value for getting a pizza based on the criterion of minimizing cost per unit of volume? 4. what other criteria might be used to select which pizza to purchase?
Answers: 3
question
Business, 22.06.2019 12:10
The cost of the beginning work in process inventory was comprised of $3,000 of direct materials, $10,000 of direct labor, and $10,000 of factory overhead. costs incurred during the period were comprised of $15,000 of direct materials costs, and $100,000 of conversion costs. the equivalent units of production (eup) for the period were 9,000 for direct materials and 6,000 for conversion. the costs per eup were:
Answers: 3
question
Business, 22.06.2019 13:10
The textbook defines ethics as “the principles of conduct governing an individual or a group,” and specifically as the standards one uses to decide what their conduct should be. to what extent do you believe that what happened at bp (british petrolium) is as much a breakdown in the company’s ethical systems as it is in its safety systems, and how would you defend your conclusion?
Answers: 2
question
Business, 22.06.2019 21:10
You own a nonunion company with 93 nonexempt employees. all of these employ- ees pack books into boxes for shipment to customers throughout the united states. because of wide differences in performance, you have decided to try performance appraisal, something never done before. until now, you have given every worker the same size increase. now you want to measure performance and reward the best performers with bigger increases. without any further information, which of the five types of appraisal formats do you think would be most appropriate? justify your answer. do you anticipate any complaints, or other comments, from employees after you implement your new system?
Answers: 1
You know the right answer?
The river near a town with a population of 150, 000 (note: not the town of Waterville above) has a v...
Questions
Questions on the website: 13722363