Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract with a large electronics manufacturer to produce three models of lithium-ion battery packs for a new line of phones. The contract calls for the following:

Battery Pack Production Quantity
PT-100 200,000
PT-200 100,000
PT-300 150,000
Photon Technologies can manufacture the battery packs at manufacturing plants located in the Philippines and Mexico. The unit cost of the battery packs differs at the two plants because of differences in production equipment and wage rates. The unit costs for each battery pack at each manufacturing plant are as follows:

Plant
Product Philippines Mexico
PT-100 $0.95 $0.98
PT-200 $0.98 $1.06
PT-300 $1.34 $1.15
The PT-100 and PT-200 battery packs are produced using similar production equipment available at both plants. However, each plant has a limited capacity for the total number of PT-100 and PT-200 battery packs produced. The combined PT-100 and PT-200 production capacities are 175,000 units at the Philippines plant and 160,000 units at the Mexico plant. The PT-300 production capacities are 75,000 units at the Philippines plant and 100,000 units at the Mexico plant. The cost of shipping from the Philippines plant is $0.15 per unit, and the cost of shipping from the Mexico plant is $0.12 per unit.

Develop a linear program that Photon Technologies can use to determine how many units of each battery pack to produce at each plant to minimize the total production and shipping cost associated with the new contract.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 05:00
At which stage would you introduce your product to the market at large? a. development stage b. market testing stage c. commercialization stage d. ideation stage
Answers: 3
question
Business, 22.06.2019 10:50
You are evaluating two different silicon wafer milling machines. the techron i costs $285,000, has a three-year life, and has pretax operating costs of $78,000 per year. the techron ii costs $495,000, has a five-year life, and has pretax operating costs of $45,000 per year. for both milling machines, use straight-line depreciation to zero over the project’s life and assume a salvage value of $55,000. if your tax rate is 24 percent and your discount rate is 11 percent, compute the eac for both machines.
Answers: 3
question
Business, 22.06.2019 14:00
How many months does the federal budget usually take to prepare
Answers: 1
question
Business, 22.06.2019 15:30
The school cafeteria can make pizza for approximately $0.30 a slice. the cost of kitchen use and cafeteria staff runs about $200 per day. the pizza den nearby will deliver whole pizzas for $9.00 each. the cafeteria staff cuts the pizza into eight slices and serves them in the usual cafeteria line. with no cooking duties, the staff can be reduced by half, for a fixed cost of $75 per day. should the school cafeteria make or buy its pizzas?
Answers: 3
You know the right answer?
Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract with a l...
Questions
Questions on the website: 13722363