A chemical plant produces sodium bisulfate in 100 kg bags. Demand for this product is 20 tonnes per day. The capacity for producing this product is 50 tonnes per day. Setup cost is $400, and storage and handling costs are $200 per tonne per year. The company operates 200 days a year. (Note: 1 tonne = 1,000 kg). a) What is the optimal number of bags per production run? b) What would the average inventory level be for this lot size? c) Determine the approximate length of a production run, in days. d) About how many production runs per year would there be? e) How much could the company save annually in inventory control cost if the setup cost could be reduced to $200 per production run and the optimal production quantity is recalculated and used?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 08:40
Which of the following is not a characteristic of enterprise applications that cause challenges in implementation? a. they introduce "switching costs," making the firm dependent on the vendor. b. they cause integration difficulties as every vendor uses different data and processes. c. they are complex and time consuming to implement. d. they support "best practices" for each business process and function. e. they require sweeping changes to business processes to work with the software.
Answers: 1
question
Business, 22.06.2019 13:50
The state troopers in one state have a motto, “nine you’re fine; ten you’re mine,” which is the standard that they use for pulling over speeders on the state highways. in other words, if the posted speed limit is 55 mph, drivers can drive at a rate up to 64 mph without fear of getting a ticket. which of the following best describes the ethical culture in the state? a. the troopers are following a standard of positive law. b. the troopers are following a normative standard. c. the troopers are following a headline test. d. the troopers are following the blanchard/peale standard.
Answers: 1
question
Business, 22.06.2019 16:30
Corrective action must be taken for a project when (a) actual progress to the planned progress shows the progress is ahead of schedule. (b) the technical specifications have been met. (c) the actual cost of the activities is less than the funds received for the work completed. (d) the actual progress is less than the planned progress.
Answers: 2
question
Business, 22.06.2019 18:00
Rosie and her brother michael decided recently to purchase an rv together. they both want to use the rv to take their families camping. the price of the rv was $10,000. since michael expects to use the rv 60% of the time and rosie 40% of the time, michael contributed $6,000 and rosie contributed $4,000. their ownership percentage equals their contribution percentage. which type of property titling should they use to reflect their ownership interest?
Answers: 1
You know the right answer?
A chemical plant produces sodium bisulfate in 100 kg bags. Demand for this product is 20 tonnes per...
Questions
question
Mathematics, 08.10.2019 10:50
Questions on the website: 13722363