Fortes Inc. has provided the following data concerning one of the products in its standard cost system. Variable manufacturing overhead is applied to products on the basis of direct labor-hours

Inputs

Standard Quantity or hours per unit of output Standard Price/rate
Direct materials 8.0 ouncs $8.1 per ounce
Direct Labor .5 hours $24.7 per hour
Variable manufacturing overhead .5 hours $6.4 per hour
The company has reported the following actual results for the product for April

Actual output 6,500 units
Raw materials purchased 62,350 ounces
Actual cost of raw materials purchased $386,210
raw materials used in production 52,020 ounces
Actual direct labor hours 3,450 hours
Actual direct labor cost $88,880
Actual variable overhead cost $21,295
Required:

a. Compute the materials price variance for April.

b. Compute the materials quantity variance for April.

c. Compute the labor rate variance for April.

d. Compute the labor efficiency variance for April.

e. Compute the variable overhead rate variance for April.

f. Compute the variable overhead efficiency variance for April.

(Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i. e., zero variance). Input all amounts as positive values.)

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:30
Dr. dow jones wants to know whether a problem-based approach to teaching economics will result in higher academic performance than his traditional method. of the six sections of economics 101 at his university, dr. jones randomly assigns three sections to the traditional method and three sections to the problem-based method for unit 1 of the course. then all sections switch the instructional method for unit 2. he plans to compare the performance of the two groups of sections on their unit 1 and unit 2 exams. this study employs a design.
Answers: 3
question
Business, 22.06.2019 06:30
Ummit record company is negotiating with two banks for a $157,000 loan. fidelity bank requires a compensating balance of 24 percent, discounts the loan, and wants to be paid back in four quarterly payments. southwest bank requires a compensating balance of 12 percent, does not discount the loan, but wants to be paid back in 12 monthly installments. the stated rate for both banks is 9 percent. compensating balances will be subtracted from the $157,000 in determining the available funds in part a. a-1. calculate the effective interest rate for fidelity bank and southwest bank. (do not round intermediate calculations. input your answers as a percent rounded to 2 decimal places.) a-2. which loan should summit accept? southwest bank fidelity bank b. recompute the effective cost of interest, assuming that summit ordinarily maintains $37,680 at each bank in deposits that will serve as compensating balances
Answers: 1
question
Business, 22.06.2019 17:40
Within the relevant range, if there is a change in the level of the cost driver, then a. total fixed costs will remain the same and total variable costs will change b. total fixed costs will change and total variable costs will remain the same c. total fixed costs and total variable costs will change d. total fixed costs and total variable costs will remain the same
Answers: 3
question
Business, 23.06.2019 00:30
You have been solicited to conduct a performance evaluation for a public organization that has been corrupted over issues of personnel embezzling funds. before actually conducting the evaluation, you—the evaluator—need to know certain specifics to conduct a thorough evaluation. compose a proposal that describes what type of evaluation will be conducted. in the proposal, explain the type of public organization. describe some of the main services, products, and activities the organization provides to the public. describe the size of the problem, who is affected by the problem, how long the problem has been in existence, and how long the evaluation will take. also, describe what the evaluation will assess with respect to organizational leadership. finally, what outcomes do you propose the evaluation will to achieve for the organization?
Answers: 2
You know the right answer?
Fortes Inc. has provided the following data concerning one of the products in its standard cost syst...
Questions
question
History, 28.01.2021 03:50
question
Mathematics, 28.01.2021 03:50
question
Mathematics, 28.01.2021 03:50
Questions on the website: 13722360