The first stage of ABC entails the assignment of a. resource costs to departments. b. activity costs to products or customers. c. resource costs to a plantwide pool. d. resource costs to distribution channels. e. resource costs to individual activities.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 01:00
Who is better at multi-tasking? in business, employees are often asked to perform a complex task when their atten-tion is divided (i.e., multi-tasking). human factors (may 2014) published a study designed to determine whether video game players are better than non–video game play-ers at multi-tasking. each in a sample of 60 college stu-dents was classified as a video game player or a non-player. participants entered a street crossing simulator and were asked to cross a busy street at an unsigned intersec-tion. the simulator was designed to have cars traveling at various high rates of speed in both directions. during the crossing, the students also performed a memory task as a distraction. two variables were measured for each student: (1) a street crossing performance score (measured out of 100 points) and (2) a memory task score (measured out of 20 points). the researchers found no differences in either the street crossing performance or memory task score of video game players and non-gamers. “these results,” say the researchers, “suggest that action video game players [and non-gamers] are equally susceptible to the costs of dividing attention in a complex task”
Answers: 1
question
Business, 22.06.2019 04:10
Universal containers(us) has an integration with its accounting system that creates tens of thousands of orders inside salesforce in a nightly batch. us wants to add automation that can attempt to match leads and contacts to these orders using the email address field on the insert. us is concerned about the performance of the automation with a large data volume. which tool should uc use to automate this process?
Answers: 1
question
Business, 22.06.2019 14:20
Anew 2-lane road is needed in a part of town that is growing. at some point the road will need 4 lanes to handle the anticipated traffic. if the city's optimistic estimate of growth is used, the expansion will be needed in 4 years and has a probability of happening of 40%. for the most likely and pessimistic estimates, the expansion will be needed in 8 and 15 years respectively. the probability of the pessimistic estimate happening is 20%. the expansion will cost $ 4.2 million and the interest rate is 8%. what is the expected pw the expansion will cost?
Answers: 1
question
Business, 22.06.2019 19:30
Which of the following occupations relate to a skill category of words and literacy
Answers: 1
You know the right answer?
The first stage of ABC entails the assignment of a. resource costs to departments. b. activity costs...
Questions
question
Social Studies, 09.07.2019 04:30
Questions on the website: 13722367