subject
Business, 20.02.2020 21:00 Spuddle4403

The management at MooseWoods Park is trying to decide whether to replace their portable toilets with flush toilets at the very popular MooseWoods Campground, as well as how many flush toilets to install, if they do choose to install them. They concluded that they will install flush toilets if the total surplus is greater than $ 50 in relation to the number of flush toilets at the equilibrium and the cost per campsite per night. Installing flush toilets will involve an increase in the cost per campsite per night. Researchers have calculated the demand and supply curves for flush toilets at this park and discovered that they are both perfectly straight lines. At $ 35 per campsite per night, no one will want flush toilets. At $ 0 per campsite per night, campers will demand seven flush toilets. Managers are willing to supply no flush toilets at the current campsite cost of $ 5 per night, but are willing to supply eight flush toilets at $ 25 per campsite per night. Please use the supply, demand and total surplus information to answer the three questions. What is the number of flush toilets desired at the equilibrium point?

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 19:30
The revenues of a company increased by 39% in year one and decreased 22% in year two. what is the overall change over the two-year period?
Answers: 1
question
Business, 21.06.2019 20:00
The maximum tax rate on estates and gifts
Answers: 1
question
Business, 21.06.2019 22:40
In allentown, pennsylvania, in the summer of 2014, the average price of a gallon of gasoline was $3.68long dasha 22-cent increase from the year before. many consumers were upset by the increase. one was quoted in a local newspaper as saying, "it's crazy. the government should step in." source: sam kennedy, "valley feeling pain at the pump," (allentown, pa) morning call, june 21, 2014. suppose the government had stepped in and imposed a price ceiling equal to old price of $3.46 per gallon. a. using the line drawing tool, draw and label the price ceiling. carefully follow the instructions above, and only draw the required object.
Answers: 3
question
Business, 22.06.2019 03:40
Apharmaceutical packaging company (ppc) has decided to reorganize its processes into cells. the company has four different production operations, each requiring a unique piece of equipment. the names and functions of the four pieces of equipment are sort, count, place, and package. the company packages five different families of products (a, b, c, d, and e). the tables below indicate the demand (total units/day by product family), required operations, and operation cycle times for each product family. assume that any individual piece of equipment is available to operate 16 hours/day, but 2 hours (in total) are lost each day on each piece of equipment due to breaks and meetings when operators are not available to operate the equipment. how many minutes/day are available for production
Answers: 3
You know the right answer?
The management at MooseWoods Park is trying to decide whether to replace their portable toilets with...
Questions
Questions on the website: 13722363