Answers: 2
Business, 22.06.2019 07:40
The cutting department of cassel company has the following production and cost data for july. production costs 1. transferred out 12,300 units. beginning work in process $0 2. started 3,900 units that are 60% materials 62,856 complete as to conversion labor 12,622 costs and 100% complete as manufacturing overhead 23,100 to materials at july 31. materials are entered at the beginning of the process. conversion costs are incurred uniformly during the process. determine the equivalent units of production for (1) materials and (2) conversion costs. materials conversion costs total equivalent units of production link to text link to text compute unit costs. (round unit costs to 2 decimal places, e.g. 2.25.) materials $ conversion costs $ link to text link to text prepare a cost reconciliation schedule. (round unit costs to 2 decimal places, e.g. 2.25 and final answers to 0 decimal places, e.g. 1,225.) cost reconciliation costs accounted for transferred out $ work in process, july 31 materials $ conversion costs total costs $
Answers: 1
Business, 22.06.2019 17:30
Four students are at an extracurricular activity fair at their high school and are trying to decide which clubs to join. some information about the students is listed in this chart: which describes which ctso each student should join?
Answers: 1
Business, 22.06.2019 21:50
Assume that (i) setups need to be completed first; (ii) a setup can only start once the batch has arrived at the resource, and (iii) all flow units of a batch need to be processed at a resource before any of the units of the batch can be moved to the next resource. process step 1 molding 2 painting 3 dressing setup time 15 min. 30 min. no setup processing time 0.25 min./unit 0.15 min./unit 0.30 min./unit which batch size would minimize inventory without decreasing the process capacity?
Answers: 1
Business, 22.06.2019 23:00
Which of the following is not one of the four principles of bottleneck management? a. increasing capacity at non-bottleneck stations is a mirageb. lost time at the bottleneck is lost system capacity.c. release work orders to the system at the bottleneck's capacity pace.d. increased bottleneck capacity is increased system capacity.e. bottlenecks should be moved to the end of the system process.
Answers: 1
What is the net present value of a project that has an initial cash outflow of $7,670 and cash inflo...
Mathematics, 06.10.2020 14:01
Medicine, 06.10.2020 14:01
History, 06.10.2020 14:01
Mathematics, 06.10.2020 14:01
Business, 06.10.2020 14:01
Mathematics, 06.10.2020 14:01
Mathematics, 06.10.2020 14:01
Mathematics, 06.10.2020 14:01
English, 06.10.2020 14:01
History, 06.10.2020 14:01
Mathematics, 06.10.2020 14:01
World Languages, 06.10.2020 14:01
Mathematics, 06.10.2020 14:01