subject
Business, 27.12.2019 06:31 travisvb

Acompany serves two markets in north america and has to decide on optimal order quantity and safety stock. the demand in the first market is equal to 1, 2, 3, or 4 with equal probability, whereas the demand in the second market is equal to 3, 4, or 5 with equal probability. the company has a target level of product availability of csl=90% on both markets. a. what is the optimal order quantity for market 1? what is the optimal safety stock for market 1? b. what is the optimal order quantity for market 2? what is the optimal safety stock for market 2? c. what are optimal order quantity and safety stock for the decentralized distribution system? d. what are optimal order quantity and safety stock for the centralized distribution system?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 02:30
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
question
Business, 22.06.2019 07:40
Myflvs -question 3 multiple choice worth 2 points)(10.04 hc)in panama city in january, high tide was at midnight. the water level at high tide was 9 feet and1 foot at low tide. assuming the next high tide is exactly 12 hours later and that the height of thewater can be modeled by a cosine curve, find an equation for water level in january for panamacity as a function of time (t).of(t) = 4 + 5of(t) = 5 cost + 4o 460) = 5 cos 1+ 4of(0) = 4 cos + 5
Answers: 1
question
Business, 22.06.2019 11:40
Select the correct answer brian wants to add a chart to his dtp project. what is the best way he can do this? a draw the chart using the dtp program draw option b create the chart in a spreadsheet then import it c. use the dtp chart wizard to create the chart within the dtp d. create an image of the chart in an image editor then import the image e use html code to create a chart within the dtp program
Answers: 3
question
Business, 22.06.2019 15:30
Calculate the required rate of return for climax inc., assuming that (1) investors expect a 4.0% rate of inflation in the future, (2) the real risk-free rate is 3.0%, (3) the market risk premium is 5.0%, (4) the firm has a beta of 2.30, and (5) its realized rate of return has averaged 15.0% over the last 5 years. do not round your intermediate calculations.
Answers: 3
You know the right answer?
Acompany serves two markets in north america and has to decide on optimal order quantity and safety...
Questions
question
Mathematics, 21.10.2020 22:01
question
Mathematics, 21.10.2020 22:01
question
Spanish, 21.10.2020 22:01
Questions on the website: 13722361