subject
Business, 24.12.2019 19:31 alisonlebron15

As illustrated in the opening case for chapter 10, boeing lost a lot of control and therefore incurred high operating costs for its build out of the 787 dreamliner, because it design and manufacturing. a. on-shoredb. internalizedc. outsourcedd. internationalized

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 09:40
Alpha industries is considering a project with an initial cost of $8 million. the project will produce cash inflows of $1.49 million per year for 8 years. the project has the same risk as the firm. the firm has a pretax cost of debt of 5.61 percent and a cost of equity of 11.27 percent. the debt–equity ratio is .60 and the tax rate is 35 percent. what is the net present value of the project?
Answers: 1
question
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
question
Business, 22.06.2019 19:30
Adisadvantage of corporations is that shareholders have to pay on profits.
Answers: 1
question
Business, 22.06.2019 22:00
Acontractor was awarded a purchase order for commercial items for $1.5 million under the authority of far subpart 13.5. the purchase order was issued in november 2010 and containedall applicable clauses that were current as of the date of the purchase order. under the purchase order, the contractor is required to comply with a small business subcontracting plan that contains all of the required elements. which of the following is true? a.the contractor must submit a standard form 294, subcontracting report for individual contracts. b.the contractor must submit an individual subcontracting report through the electronic subcontracting reporting system (esrs). c.the contractor may submit either an sf 294 or report its subcontracting through esrs. d.the contractor is not required to submit any subcontracting reports.
Answers: 1
You know the right answer?
As illustrated in the opening case for chapter 10, boeing lost a lot of control and therefore incurr...
Questions
question
Mathematics, 10.09.2021 05:40
question
English, 10.09.2021 05:40
question
History, 10.09.2021 05:40
question
Mathematics, 10.09.2021 05:40
question
Mathematics, 10.09.2021 05:40
question
Health, 10.09.2021 05:40
question
Mathematics, 10.09.2021 05:40
question
Mathematics, 10.09.2021 05:40
Questions on the website: 13722363