subject
Business, 03.12.2019 01:31 angelinaissoocp33868

In the aftermath of hurricane thelma, the u. s. army corps of engineers is considering two alternative approaches to protect a freshwater wetland from the encroaching seawater during high tides.. the first alternative, the construction of a 5-mile long, 20-foot-high levee, would have an investment cost of $25,000,000 with annual upkeep costs estimated at $725,000. a new roadway along the top of the levee would provide two major benefits: (1) improved recreational access for fishermen and (2) reduction of the driving distance between the towns at opposite ends of the proposed levee by 11 miles. the annual benefit for the levee has been estimated at $1,500,000. the second alternative, a channel-dredging operation, would have an investment cost of $15,000,000. the annual cost of maintaining the channel is estimated at $375,000. there are no documented benefits for the channel-dredging project. using a marr of 8% and assuming a 25-year life for either alternative, apply the incremental b–c ratio ( \delta b /\deltac )method to determine which alternative should be chosen.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 14:50
Which of the following is the most direct cause of cost-push inflation? a. rising production costs. b. reductions in wages. c. greater scarcity of natural resources. d. increasing supply of goods and services. 2b2t
Answers: 3
question
Business, 21.06.2019 16:30
Which of the following goals is most effective? i will purchase a house by age twenty-five. i will purchase a three-bedroom house located near cherry park by my twenty-fifth birthday. in order to reach this goal, i will graduate from college and secure a job as a software developer.
Answers: 2
question
Business, 22.06.2019 16:10
Answer the following questions using the banker’s algorithm: a. illustrate that the system is in a safe state by demonstrating an order in which the processes may complete. b. if a request from process p1 arrives for (1, 1, 0, 0), can the request be granted immediately? c. if a request from process p
Answers: 1
question
Business, 22.06.2019 21:10
Kinc. has provided the following data for the month of may: inventories: beginning ending work in process $ 17,000 $ 12,000 finished goods $ 46,000 $ 50,000 additional information: direct materials $ 57,000 direct labor cost $ 87,000 manufacturing overhead cost incurred $ 63,000 manufacturing overhead cost applied to work in process $ 61,000 any underapplied or overapplied manufacturing overhead is closed out to cost of goods sold. the adjusted cost of goods sold that appears on the income statement for may is:
Answers: 3
You know the right answer?
In the aftermath of hurricane thelma, the u. s. army corps of engineers is considering two alternati...
Questions
question
Mathematics, 06.05.2020 07:32
question
Mathematics, 06.05.2020 07:32
question
Mathematics, 06.05.2020 07:32
question
English, 06.05.2020 07:32
Questions on the website: 13722367