Materials costs of $1026000 and conversion costs of $1370480 were charged to a processing department in the month of september. all materials are added at the beginning of the process, while conversion costs are incurred uniformly throughout the process. there were no units in beginning work in process, 19 units were started into production in september, and there were 8000 units in ending work in process that were 40% complete at the end of september.
what was the total amount of manufacturing costs assigned to those units that were completed and transferred out of the process in september?

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 20:20
Atoy manufacturer makes its own wind-up motors, which are then put into its toys. while the toy manufacturing process is continuous, the motors are intermittent flow. data on the manufacture of the motors appears below.annual demand (d) = 50,000 units daily subassembly production rate = 1,000setup cost (s) = $85 per batch daily subassembly usage rate = 200carrying cost = $.20 per unit per year(a) to minimize cost, how large should each batch of subassemblies be? (b) approximately how many days are required to produce a batch? (c) how long is a complete cycle? (d) what is the average inventory for this problem? (e) what is the total annual inventory cost (holding plus setup) of the optimal behavior in this problem?
Answers: 2
question
Business, 22.06.2019 05:50
Emily spent her summer vacation in buenos aires, argentina, where she got plastic surgery for a fraction of what it would cost in the united states. this is an example of:
Answers: 2
question
Business, 22.06.2019 19:30
The owner of firewood to go is considering buying a hydraulic wood splitter which sells for $50,000. he figures it will cost an additional $100 per cord to purchase and split wood with this machine, while he can sell each cord of split wood for $125. if, for this machine, design capacity is 50 cords per day, effective capacity is 40 cords per day, and actual output is expected to be 32 cords per day, what would be its efficiency?
Answers: 1
question
Business, 23.06.2019 01:10
1. alwaysrain irrigation, inc. would like to determine capacity requirements for the next four years. currently, two production lines are in place for making bronze and plastic sprinklers. three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. management has forecast demand for the next four years as follows: both production lines can produce all the different types of nozzles. the bronze machines needed for the bronze sprinklers require two operators and can produce up to 12,000 sprinklers. the plastic injection molding machine needed for the plastic sprinklers requires four operators and can produce up to 200,000 sprinklers. three bronze machines and only one injection molding machine are available. what are the capacity requirements for the next four years? (assume that there is no learning.)
Answers: 1
You know the right answer?
Materials costs of $1026000 and conversion costs of $1370480 were charged to a processing department...
Questions
question
Social Studies, 14.10.2021 03:40
question
Mathematics, 14.10.2021 03:40
question
Social Studies, 14.10.2021 03:40
question
Chemistry, 14.10.2021 03:50
question
Mathematics, 14.10.2021 03:50
question
Mathematics, 14.10.2021 03:50
Questions on the website: 13722363