Business, 26.08.2019 08:30 hamada11617
Based on the following information, what is the order point? lead time = 3 weeks demand/week = 200 units safety stock = 1 weeks’ supply lot size = 100 units
Answers: 1
Business, 22.06.2019 03:30
Diversified semiconductors sells perishable electronic components. some must be shipped and stored in reusable protective containers. customers pay a deposit for each container received. the deposit is equal to the container’s cost. they receive a refund when the container is returned. during 2018, deposits collected on containers shipped were $856,000. deposits are forfeited if containers are not returned within 18 months. containers held by customers at january 1, 2018, represented deposits of $587,000. in 2018, $811,000 was refunded and deposits forfeited were $41,000. required: 1. prepare the appropriate journal entries for the deposits received and returned during 2018. 2. determine the liability for refundable deposits to be reported on the december 31, 2018, balance sheet.
Answers: 1
Business, 22.06.2019 16:20
The assumptions of the production order quantity model are met in a situation where annual demand is 3650 units, setup cost is $50, holding cost is $12 per unit per year, the daily demand rate is 10 and the daily production rate is 100. the production order quantity for this problem is approximately:
Answers: 1
Business, 22.06.2019 22:00
Brody corp. uses a process costing system in which direct materials are added at the beginning of the process and conversion costs are incurred uniformly throughout the process. beginning inventory for january consisted of 1,050 units that were 65% completed. 10,900 units were started into the process during january. on january 31, the inventory consisted of 500 units that were 50% completed. what would be the equivalent units for direct materials cost using the weighted average method?
Answers: 2
Business, 22.06.2019 22:30
The answer here, x=7, is not in the interval that you selected in the previous part. what is wrong with the work shown above?
Answers: 1
Based on the following information, what is the order point? lead time = 3 weeks demand/week = 200...
Biology, 11.01.2020 16:31
English, 11.01.2020 16:31
Chemistry, 11.01.2020 16:31
Mathematics, 11.01.2020 16:31
Geography, 11.01.2020 16:31
Chemistry, 11.01.2020 16:31
Mathematics, 11.01.2020 16:31
Business, 11.01.2020 16:31
Mathematics, 11.01.2020 16:31
Mathematics, 11.01.2020 16:31