Advanced Placement (AP), 24.09.2020 14:01 Ashleymsmith
Woodland Bicycles makes two models of off-road bicycles: the Explorer, which sells for $250, and the Grande Expedition, which sells for $350. Both models use the same frame, but the painting and assembly time required for the Explorer is 2 hours, while the time is 3 hours for the Grande Expedition. There are 375 frames and 450 hours of labor available for production. How many of each model should be produced to maximize revenue?
a.
200 Explorers
50 Grande Expeditions
c.
225 Explorers
0 Grande Expeditions
b.
150 Explorers
10 Grande Expeditions
d.
325 Explorers
50 Grande Expeditions
Answers: 3
Advanced Placement (AP), 23.06.2019 11:20
I’ll give you free brainliest + free points if you answer this correctly the most common cause of a stuck accelerator is the a. engine b. steering wheel c. brakes d. floor mat
Answers: 1
Advanced Placement (AP), 23.06.2019 15:00
What is the function of the organelle labeled a in the diagram?
Answers: 3
Advanced Placement (AP), 24.06.2019 00:30
Which body region is lateral to the sternal region and superior to the brachial region?
Answers: 1
Advanced Placement (AP), 25.06.2019 05:30
The closer the genetic link between two individuals, the greater the correspondence
Answers: 2
Woodland Bicycles makes two models of off-road bicycles: the Explorer, which sells for $250, and the...
Geography, 01.03.2021 09:50
Mathematics, 01.03.2021 09:50
Mathematics, 01.03.2021 09:50
Business, 01.03.2021 09:50
English, 01.03.2021 09:50
Chemistry, 01.03.2021 09:50
Spanish, 01.03.2021 09:50
Social Studies, 01.03.2021 09:50
English, 01.03.2021 09:50
Mathematics, 01.03.2021 09:50
Mathematics, 01.03.2021 14:00